Turnkey supply of the repowering of the Bolgiano Cogeneration Power Plant

Customer: Enipower S.p.a.

Site: Bolgiano (MI)

Turnkey supply of the repowering of the cogeneration power plant including: a new gas turbine (42 Mwe) and relative recovery boiler with post-combustion (78MWt), two gas engines (9 MWe each) and relative recovery boiler (12 MWt each), three auxiliary boilers (100 MWt), a new HV electrical station section including HV/MVpower transformer.

ACTIVITY: Assembly

Go back to Assembly>>
Go back to Highlights >>