Supply and installation of a new medium pressure steam line for the interconnection of Sarlux South and Sarlux North plants.
Included in the contract:
- the study of pipe routing,
- hydraulic system calculations,
- sizing of mechanical equipment,
- civil works,
- E&I instruments.
The line has been sized for the handling of 50t/h of medium pressure steam in both directions.